Delivery of port cranes
This is part of the investment into the new container terminal Carmel which will be suitable for 10,000 TEU vessels. It will have a pier of 700 metres with a water depth of 15.5 metres.
This is part of the investment into the new container terminal Carmel which will be suitable for 10,000 TEU vessels. It will have a pier of 700 metres with a water depth of 15.5 metres.